June 2009
 

Upcoming Events

July 27 - 29
2009 Business Acumen for Emerging Leaders
- Session 4

Colorado Springs, CO

Sept. 10 - 11
2009 Environmental
Forum

Bellevue, WA

Sept. 10 - 11
2009 Electric Safety
and Gas Safety &
Occupational Health
Meeting

Bellevue, WA

Sept. 14 - 18
55th Annual Northwest
Electric Meter School

Seattle, WA

Sept. 20 - 22
2009 Annual Meeting
Victoria, BC

Sept. 21 - 23
2009 Business Acumen for Emerging Leaders
- Session 5

Victoria, BC

Sept. 27 - 30
2009 Joint Use
Conference

Boise, ID

Oct. 5 - 6
2009 Underground / Overhead Electric Distribution Fall Meeting
Portland, OR

Oct. 14 - 16
2009 Materials Management Meeting
Henderson, NV

Oct. 21 - 23
2009 Operations
Business Strategies
Fall Meeting
(Invitation Only)

Stevenson, WA

Oct. 27 - 28
2009 Utility Pole
Structures Conference
and Trade Show
(In partnership with
NWPPA)

Bellevue, WA

Oct. 28 - 30
2009 Western Region
Mutual Assistance
Agreement (WRMAA)
Annual Meeting

Las Vegas, NV

Nov. 4
Gas 101 - Conducted by Enerdynamics
Portland, OR

Nov. 4 - 6
2009 Energy Management Fall Meeting (Invitation Only)
Tempe, AZ

Nov. 5
Electric 101 - Conducted by Enerdynamics
Portland, OR

2010 Programs

Mar. 7 - 9
Spring Energy Symposium
Tempe, AZ

Mar. 30 - Apr. 2
2010 Operations Conference
Henderson, NV

June 7 - 11
2010 Power Quality School
Willsonville, OR

Sept. 19 - 21
2010 Annual Meeting
Las Vegas, NV

 

Southern California Edison Will Not Seek License to Construct Transmission Line in Arizona at This Time

Southern California Edison has announced it will not pursue a re-filing of its application with the Arizona Corporation Commission to build the Arizona portion of the Devers-PaloVerde No. 2 (DPV2) electric transmission line at this time.

 

In addition, SCE will cease its current pre-filing activities at the Federal Energy Regulatory Commission for the project.

 

The Arizona portion of this transmission line would have extended from the Blythe, Calif. area to the Palo Verde Nuclear Generating Station 50 miles west of Phoenix, Ariz.

 

The DPV2 project, a 270-mile, high-voltage, electric transmission line, was originally filed in Arizona in 2006. SCE intends to pursue construction of the California portion of the project from the Palm Springs area east to Blythe, which is needed to interconnect new conventional and renewable generation resources in the Blythe area.

 

SCE will continue to study current and future requests for interconnection to the California Independent System Operator (CAISO) grid in southeastern California and western Arizona. If these studies, or subsequent ones, establish the need for new transmission lines in western Arizona to interconnect new renewable or other generation resources into the CAISO system, SCE will seek authorization from the applicable regulatory authorities to construct the necessary transmission lines.

 

Pedro Pizarro, SCE’s executive vice president of Power Operations, said a recent financial analysis of the project indicates that California’s economic benefits of constructing the Arizona portion of the project are reduced significantly, due to changes in the economy and power markets since SCE’s initial filing with the California Public Utilities Commission (CPUC) in 2005.

 

Primary changes include anticipated future renewable generation development, generator interconnection requests in California, future projections of fuel supplies, and reduced demand for electricity in California.

 

“Results of SCE’s new analysis conclude that the Arizona portion of the project cannot be currently justified as an economic investment primarily funded by California consumers,” Pizarro said. 

 

The CPUC approved construction of the entire DPV2 project and issued the company a Certificate of Public Convenience and Necessity in January 2007. SCE has filed a Petition to Modify the Certificate with the commission in order to construct the California portion of DPV2.

Return to June 2009 Western Energy News

 
       
Western Energy News
 

To sponsor Western Energy News, please contact WEI at 503 231-1994.

Western Energy Institute - http://www.westernenergy.org/
827 NE Oregon Street, Portland, Oregon 97232-2172
Phone: (503) 231-1994   Fax: (503) 231-2595  
June 2009 News Team
Publisher: Chuck Meyer
Editor: John Rozsa
 
Copyright © 2009. Reuse of this publication or its contents is allowed with credit to Western Energy Institute.