October 2009
 

Upcoming Events

Oct. 21 - 23
2009 Operations
Business Strategies
Fall Meeting
(Invitation Only)

Stevenson, WA

Oct. 27 - 28
2009 Utility Pole
Conference
and Trade Show
(In partnership with
NWPPA)

Bellevue, WA

Oct. 28 - 30
2009 Western Region
Mutual Assistance
Agreement (WRMAA)
Annual Meeting

Las Vegas, NV

Nov. 4
Gas 101 - Conducted by Enerdynamics
Portland, OR

Nov. 5
Electric 101 - Conducted by Enerdynamics
Portland, OR

Nov. 10 - 11
2009 Energy Management Fall Meeting
(Invitation Only)

Tempe, AZ

Nov. 17
2009 Smart Grid Forum Invitation Only)
Los Angeles, CA

2010 Programs

Jan. 24 - 26
2010 Board of Directors Meeting (Invitation Only)
Del Mar, CA

Jan. 22 - 24
2010 Business Acumen for Emerging Leaders
- Session One
Pomona, CA

Mar. 7 - 9
2010 Spring Energy Symposium
Tempe, AZ

Mar. 15 - 19
2010 Hands-On Relay School
Pullman, WA

Mar. 29 - 30
2010 Emergency Response and Assistance Practices Meeting
Henderson, NV

Mar. 30 - Apr. 2
2010 Operations Conference
Henderson, NV

Apr. 12 - 14
2010 Business Acumen for Emerging Leaders
- Session Two
Portland, OR

May 5 - 7
2010 Secondary Network Meeting
Vancouver, BC

May 12 - 14
2010 Executive Planning Meeting (Invitation Only)
Portland, OR

June 7 - 11
2010 Power Quality School
Wilsonville, OR

June 7 - 9
2010 Business Acumen for Emerging Leaders
- Session Three
Surrey, BC

Aug. 2 - 4
2010 Business Acumen for Emerging Leaders
- Session Four
Bozeman, MT

Sep. 19 - 21
2010 Annual Meeting
Lake Tahoe, CA

Sep. 19 - 21
2010 Business Acumen for Emerging Leaders
- Session Five
Lake Tahoe, CA

Sep. 26 - 29
2010 Joint Use Conference
Vancouver,WA

 

 

TransCanada to Build $1.2 Billion Power Plant in Southern Ontario

The Ontario Power Authority (OPA)  has advised TransCanada Corporation it has been awarded a 20-year Clean Energy Supply Contract to build, own and operate the 900 megawatt Oakville Generating Station (OGS) in Oakville, Ontario.

 

TransCanada expects to invest approximately $1.2 billion in the natural gas fired combined cycle plant, which is scheduled to start producing power by the end of 2013.

 

“We look forward to providing additional electricity supply and reliability within this key North American market,” said Hal Kvisle, TransCanada’s chief executive officer. “This facility strengthens our presence as the largest private sector power company in Ontario and Canada.  The Oakville generating station is a strong fit with our strategy of developing large scale energy infrastructure projects that will produce stable, long-term returns for our shareholders.”   

 

TransCanada’s bid for the OGS was submitted in response to the OPA’s Southwest Greater Toronto Area Request for Proposals (SW GTA RFP). According to the OPA, the OGS will help meet critical energy and stability needs in the area.  The plant will provide the reliability required to support Ontario’s growing renewable energy electricity production such as wind and solar and contribute toward replacing coal-fired generation.

 

Approximately 600 construction jobs will be created during the construction period of about 28 months. There will also be significant local spending on goods and services including food, lodging and supplies during construction and throughout the operating life of the plant. Additionally, approximately 25 permanent jobs will be created.  The generating station is expected to be completed at the end of 2013. 

 

Next steps involve completing an Environmental Review Report which will be made available for public review and comment in the fall. Emissions from OGS will meet or better all environmental regulatory standards. TransCanada must receive approval from the Ministry of the Environment on impacts such as air quality and noise before construction of the facility can proceed. Local community input is very important and extensive consultations will continue with stakeholders.

 

The OGS will be located on private, industrial land in the town of Oakville on Royal Windsor Drive, situated just east of the Queen Elizabeth Way (QEW) and will provide reliable, clean power to help meet the specific needs of the area.

 

TransCanada will work with the OPA to finalize the contract by mid-October 2009.

Return to October 2009 Western Energy News

 
       
Western Energy News
 

To sponsor Western Energy News, please contact WEI at 503 231-1994.

Western Energy Institute - http://www.westernenergy.org/
827 NE Oregon Street, Portland, Oregon 97232-2172
Phone: (503) 231-1994   Fax: (503) 231-2595  
October 2009 News Team
Publisher: Chuck Meyer
Editor: John Rozsa
 
Copyright © 2009. Reuse of this publication or its contents is allowed with credit to Western Energy Institute.